681-695 of 695 results for subject:M4
Librarians' tools
- Search time
- 0.213 seconds
- Solr query time
- 0.005 seconds
- Search query
- subject:M4
- We searched for
- subject_t:M4 OR subject_ses:11458
Type
House
Session
More
Year
More
Department
More
Member
More
Primary member
More
Answering member
More
Legislative stage
Legislation
Subject
More
Publisher
To take steps to ensure that M4 will be complete & continuous from England to Pont Abraham by 1992 (Failed OPQ)
To take steps to ensure that M4 will be complete & continuous from England to Pont Abraham by 1992 (Failed OPQ)
To give the starting date & the completion date for the construction of the section of the M4 motorway between Baglan & Neath; & if the contracts for the 4 contracts in the scheme will be tendered for simultaneously.
To give the starting date & the completion date for the construction of the section of the M4 motorway between Baglan & Neath; & if the contracts for the 4 contracts in the scheme will be tendered for simultaneously.
What estimate has been made of increased traffic on M4 as a result of the authorisation to use Heathrow for charter flights.
What estimate has been made of increased traffic on M4 as a result of the authorisation to use Heathrow for charter flights.
To give latest available 24-hour traffic flow date for each link of the M1, M4 (in England) the M6, M25 & M5. - Will write.
To give latest available 24-hour traffic flow date for each link of the M1, M4 (in England) the M6, M25 & M5. - Will write.
Table showing the latest available traffic flow figures for each link of the M4 motorway in Wales.
Table showing the latest available traffic flow figures for each link of the M4 motorway in Wales.
To take steps to minimise the no of night-time closures made necessary by the maintenance works due to take place from the end of July between junctions 3 & 1 on the M4 motorway.
To take steps to minimise the no of night-time closures made necessary by the maintenance works due to take place from the end of July between junctions 3 & 1 on the M4 motorway.
What ammunition was being carried on the lorry that caught fire on the M4 in Newport on 30 January.
What ammunition was being carried on the lorry that caught fire on the M4 in Newport on 30 January.
What is cost of replacing central barriers on M4 between London & Bristol, junctions 1 to 20 & to estimate date of completion of this work.
What is cost of replacing central barriers on M4 between London & Bristol, junctions 1 to 20 & to estimate date of completion of this work.
What are latest traffic flow figures for those sections of M4 for which WO is responsible
What are latest traffic flow figures for those sections of M4 for which WO is responsible
What was cost of constructing M4 between London & Maidenhead Thicket & of widening this section of M4 from 2 lanes to 3; & what estimate was made at time of construction of cost of constructing with 3 lanes.
What was cost of constructing M4 between London & Maidenhead Thicket & of widening this section of M4 from 2 lanes to 3; & what estimate was made at time of construction of cost of constructing with 3 lanes.
Table showing latest 5-day & 7-day average traffic flows on a 16 & 24 hour basis on each section of the M4 between west London & Reading.
Table showing latest 5-day & 7-day average traffic flows on a 16 & 24 hour basis on each section of the M4 between west London & Reading.
For how long it is intended to close London end of M4 motorway at night & if there is any way by which one land of it each way could be left open
For how long it is intended to close London end of M4 motorway at night & if there is any way by which one land of it each way could be left open