1-2 of 2 results for subject:Standards
Librarians' tools
- Search time
- 0.217 seconds
- Solr query time
- 0.007 seconds
- Search query
- subject:Standards
- We searched for
- subject_t:Standards OR subject_t:Benchmarking OR subject_t:"Performance indicators" OR subject_t:"Performance measurement" OR subject_t:"Performance standards" OR subject_t:"Performance targets" OR subject_ses:93107
Type
House
Session
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
More
Publisher
To ask the Secretary of State for Transport, what plans he has to instruct South Western Railway to reinstate pre-covid-19 outbreak levels of service between Epsom to London Waterloo.
To ask the Secretary of State for Transport, what plans he has to instruct South Western Railway to reinstate pre-covid-19 outbreak levels of service between Epsom to London Waterloo.
South Western Railway (SWR) has provided an increase in peak service between Epsom and London Waterloo from Monday 17 May, this represents an increase on previous service provision. SWR is currently running at 85% of pre-COVID levels, a 13% increase on the pre-17th May Timetable. Service levels will continue to be reviewed regularly to ensure the capacity provided continues to meet the demand.
To ask the Secretary of State for Transport, Local Government and the Regions, what the rate of (a) track and (b) signal failures has been on suburban routes into (i) Waterloo and (ii) London Victoria in each of the past six months.
To ask the Secretary of State for Transport, Local Government and the Regions, what the rate of (a) track and (b) signal failures has been on suburban routes into (i) Waterloo and (ii) London Victoria in each of the past six months.