1-6 of 6 results for subject:Roads
Librarians' tools
- Search time
- 0.208 seconds
- Solr query time
- 0.004 seconds
- Search query
- subject:Roads
- We searched for
- subject_t:Roads OR subject_t:Carriageways OR subject_t:Highways OR subject_t:"Public highways" OR subject_t:Streets OR subject_t:"Trunk roads" OR subject_ses:92868
Type
House
Session
Year
Department
Member
Primary member
More
Answering member
Legislative stage
Legislation
Subject
More
Publisher
How much of the Community Infrastructure Fund has been allocated to: road, rail, light rail, bus, cycling and walking schemes.
How much of the Community Infrastructure Fund has been allocated to: road, rail, light rail, bus, cycling and walking schemes.
| Road schemes | £82 million |
| Rail schemes | £42 million |
| Light rail schemes | £7 million |
| Bus schemes | £59 million |
| Cycling and walking | £3 million |
| Total | £193 million |
Whether the recently announced upgrade of the A14 by the Highways Agency alters the case for the guided busway between Cambridge and St Ives.
Whether the recently announced upgrade of the A14 by the Highways Agency alters the case for the guided busway between Cambridge and St Ives.
How much prior notice Transport for London was given of road closures caused by the visit of President Bush to enable it to plan diversionary routes for its bus services. [HL 85].
How much prior notice Transport for London was given of road closures caused by the visit of President Bush to enable it to plan diversionary routes for its bus services. [HL 85].
With regard to the proposed guided busway in Cambridgeshire: (a) under what regulations it will be required to be constructed and operated; (b) whether the level crossing design and operations for guided busway across roads will differ from rail level crossings; (c) who will be responsible for installing and maintaining...
With regard to the proposed guided busway in Cambridgeshire: (a) under what regulations it will be required to be constructed and operated; (b) whether the level crossing design and operations for guided busway across roads will differ from rail level crossings; (c) who will be responsible for installing and maintaining...
Which organisations are responsible for the safe operation of buses in London and what are their particular terms of reference in respect of each element of safety.
Which organisations are responsible for the safe operation of buses in London and what are their particular terms of reference in respect of each element of safety.
If London bus drivers are permitted to use a mobile phone or radio while on the move.
If London bus drivers are permitted to use a mobile phone or radio while on the move.