1-20 of 142 results for subject:Bridges
Librarians' tools
- Search time
- 0.207 seconds
- Solr query time
- 0.004 seconds
- Search query
- subject:Bridges
- We searched for
- subject_t:Bridges OR subject_ses:90377
Type
House
Session
Year
Department
Member
More
Primary member
More
Answering member
Legislative stage
Legislation
Subject
More
Publisher
That this House congratulates the architects, engineers, Gateshead Council and all concerned in the design, construction and operation of Gateshead Millennium Bridge on winning the most coveted Royal Institute of British Architects annual Stirling Prize; notes the comments of the judging panel that the bridge is 'outstanding' and 'the one new piece of architecture that will be remembered by people this year'; further notes that this recognition of excellence by the RIBA is further evidence of the quality of the renaissance taking place on the banks of the Tyne and a positive contribution to the joint bid to become European Capital of Culture in 2008.
That this House congratulates the architects, engineers, Gateshead Council and all concerned in the design, construction and operation of Gateshead Millennium Bridge on winning the most coveted Royal Institute of British Architects annual Stirling Prize; notes the comments of the judging panel that the bridge is 'outstanding' and 'the one...
Statement on what action he will take to minimise the damage to Eltham and to Oxleas Wood of the road to the proposed East London River Crossing. - Inc fact that HMG have decided not to proceed with current plans.
Statement on what action he will take to minimise the damage to Eltham and to Oxleas Wood of the road to the proposed East London River Crossing. - Inc fact that HMG have decided not to proceed with current plans.
What assessment has been made of the length of time it will take to renew existing British Rail bridges, trains, signalling and power supply equipment at the present rate of replacements; and what information he has on the average design life of each category or main type of (a) bridge,...
What assessment has been made of the length of time it will take to renew existing British Rail bridges, trains, signalling and power supply equipment at the present rate of replacements; and what information he has on the average design life of each category or main type of (a) bridge,...
If he will comment on the information available to him on the incidence and effect of high winds on the Dartford/Thurrock bridge. - Inc figure.
If he will comment on the information available to him on the incidence and effect of high winds on the Dartford/Thurrock bridge. - Inc figure.
Table showing number of vehicles which cross Roe bridge at Limavady, & number of vehicles which cross Roe bridge at Dungiven, each day & number of such vehicles which are believed to be heavy commercial vehicles; & also highest & lowest hourly traffic flows. - (Holding answer 9 Jan 1990).
Table showing number of vehicles which cross Roe bridge at Limavady, & number of vehicles which cross Roe bridge at Dungiven, each day & number of such vehicles which are believed to be heavy commercial vehicles; & also highest & lowest hourly traffic flows. - (Holding answer 9 Jan 1990).
To estimate present flow of traffic on daily & maximum & minimum hourly flow basis across Bann bridge, Coleraine & Mountsandel bridge, Coleraine; what were figures when last traffic census was taken; & what were figures for Bann bridge before Mountsandel bridge was opened. - (Holding answer 9 Jan 1990).
To estimate present flow of traffic on daily & maximum & minimum hourly flow basis across Bann bridge, Coleraine & Mountsandel bridge, Coleraine; what were figures when last traffic census was taken; & what were figures for Bann bridge before Mountsandel bridge was opened. - (Holding answer 9 Jan 1990).
When construction of third Dartford crossing will be completed.
When construction of third Dartford crossing will be completed.
Table showing debt outstanding on Severn bridge for each year since bridge opened & toll revenue collected each year since it opened
Table showing debt outstanding on Severn bridge for each year since bridge opened & toll revenue collected each year since it opened
If there are any plans to change level of parapet on the Brinnington road & Lingard lane road bridges & the Lapwing lane footbridge over the M66
If there are any plans to change level of parapet on the Brinnington road & Lingard lane road bridges & the Lapwing lane footbridge over the M66
To state policy on early construction of Barnstaple downstream bridge & completion of bypass around Barnstaple (Failed OPQ)
To state policy on early construction of Barnstaple downstream bridge & completion of bypass around Barnstaple (Failed OPQ)
When DTp expects to publish inspector's report into toll charges on Severn bridge; & when it is expected to announce decision on inspector's recommendations - As soon as possible
When DTp expects to publish inspector's report into toll charges on Severn bridge; & when it is expected to announce decision on inspector's recommendations - As soon as possible
If DTp has now reached decision on inspectors report following last years inquiry into toll charges on Humber bridge & if there have been any discussions with bridge authorities re outstanding debt
If DTp has now reached decision on inspectors report following last years inquiry into toll charges on Humber bridge & if there have been any discussions with bridge authorities re outstanding debt
If DTp has now received report of inspector who conducted inquiry into Govts proposals to increase toll charges on Severn bridge - Yes. It is being considered
If DTp has now received report of inspector who conducted inquiry into Govts proposals to increase toll charges on Severn bridge - Yes. It is being considered
To make arrangements for exhibition at Westminster similar to one currently on display in venues in Gwent together with briefing by officials in order for honMembers on both sides of Bristol Channel to be fully informed of proposals for second Severn crossing
To make arrangements for exhibition at Westminster similar to one currently on display in venues in Gwent together with briefing by officials in order for honMembers on both sides of Bristol Channel to be fully informed of proposals for second Severn crossing
What information is available on the average weekly amount of rail freight transported over Barnes bridge & its average journey length; & what assessment has been made of equivalent number of average road freight vehicle miles this represents. - This information is not known to DTp.
What information is available on the average weekly amount of rail freight transported over Barnes bridge & its average journey length; & what assessment has been made of equivalent number of average road freight vehicle miles this represents. - This information is not known to DTp.
If full compensation will be paid to local authorities for strengthening of bridges & roads in their areas should 40-tonne lorries be allowed on British roads
If full compensation will be paid to local authorities for strengthening of bridges & roads in their areas should 40-tonne lorries be allowed on British roads
What representations have been received in respect of proposed revisions to routes of link roads to second Severn crossing.
What representations have been received in respect of proposed revisions to routes of link roads to second Severn crossing.
What was outcome of the Council meeting on heavier lorries on 5 June; & what are implications for UK & roads & bridge expenditure. - Includes figures.
What was outcome of the Council meeting on heavier lorries on 5 June; & what are implications for UK & roads & bridge expenditure. - Includes figures.
Pursuant to para 30 of the consultation paper, "New Roads by New Means": what is seen as an appropriate toll level on the second Severn crossing & what form of control HM's Govt will place on the level of toll to be charged on the second Severn crossing.
Pursuant to para 30 of the consultation paper, "New Roads by New Means": what is seen as an appropriate toll level on the second Severn crossing & what form of control HM's Govt will place on the level of toll to be charged on the second Severn crossing.
When repair & renewal work on Severn bridge will be completed; & what is current estimated total cost of this work. - Figure given.
When repair & renewal work on Severn bridge will be completed; & what is current estimated total cost of this work. - Figure given.