1-19 of 19 results for subject:Roads
Librarians' tools
- Search time
- 0.26 seconds
- Solr query time
- 0.007 seconds
- Search query
- subject:Roads
- We searched for
- subject_t:Roads OR subject_t:Carriageways OR subject_t:Highways OR subject_t:"Public highways" OR subject_t:Streets OR subject_t:"Trunk roads" OR subject_ses:92868
Type
House
Session
Year
Department
Member
Primary member
More
Answering member
Legislative stage
Legislation
Subject
More
Publisher
Pursuant to his Answer of 5th March, Official Report, columns 607-9, what are the lengths of road classified as (a) orange and (b) red for traffic congestion according to the maps produced by the national roads network assessment systems for (i) 1995, (ii) 2005 and (iii) 2015 in (1) London,...
Pursuant to his Answer of 5th March, Official Report, columns 607-9, what are the lengths of road classified as (a) orange and (b) red for traffic congestion according to the maps produced by the national roads network assessment systems for (i) 1995, (ii) 2005 and (iii) 2015 in (1) London,...
If he will list those stretches of road, including bridges, classified as orange and red for congestion in 1995 for each region which have residual life of (a) nought years and (b) nought to four years; and if he will specify the maintenance planned for those stretches of road.
If he will list those stretches of road, including bridges, classified as orange and red for congestion in 1995 for each region which have residual life of (a) nought years and (b) nought to four years; and if he will specify the maintenance planned for those stretches of road.
If he will publish by region the maintenance planned by the Highways Agency for those parts of the trunk road network in England, including bridges, classified as condition orange and condition red for traffic congestion according to the maps produced by the National Roads Network Assessment System for (a) 1995,...
If he will publish by region the maintenance planned by the Highways Agency for those parts of the trunk road network in England, including bridges, classified as condition orange and condition red for traffic congestion according to the maps produced by the National Roads Network Assessment System for (a) 1995,...
If he will publish by region the residual life remaining in those parts of the trunk road network in England, including bridges, classified as condition orange and condition red for traffic congestion according to the maps produced by the National Roads Network Assessment System for (a) 1995, (b) 2005 and...
If he will publish by region the residual life remaining in those parts of the trunk road network in England, including bridges, classified as condition orange and condition red for traffic congestion according to the maps produced by the National Roads Network Assessment System for (a) 1995, (b) 2005 and...
What assessment his Department has made of the proposal for a new Swale bridge to the Isle of Sheppey; what provision has been made for this project in his Department's future programme; and what priority has been accorded to the project.
What assessment his Department has made of the proposal for a new Swale bridge to the Isle of Sheppey; what provision has been made for this project in his Department's future programme; and what priority has been accorded to the project.
When he expects to publish the study undertaken by his Department into the total cumulative environmental impact of the National Roads Programme.
When he expects to publish the study undertaken by his Department into the total cumulative environmental impact of the National Roads Programme.
How many stage one corridor assessments were undertaken by his Department between 1992 and 1996; and if he will (a) list and (b) publish these assessments.
How many stage one corridor assessments were undertaken by his Department between 1992 and 1996; and if he will (a) list and (b) publish these assessments.
What property his Department holds for the purposes of the present and previously planned roads programme, indicating (a) the number of houses, (b) the number of other properties and (c) the extent of land holdings; and what was the total amount spent in purchasing the property in each of these...
What property his Department holds for the purposes of the present and previously planned roads programme, indicating (a) the number of houses, (b) the number of other properties and (c) the extent of land holdings; and what was the total amount spent in purchasing the property in each of these...
How much of the property purchased for the purposes of the roads programme is no longer required following the removal of schemes from the programme; and if he will list (a) the number of houses, (b) the number of other properties and (c) the extent of the land holdings involved.
How much of the property purchased for the purposes of the roads programme is no longer required following the removal of schemes from the programme; and if he will list (a) the number of houses, (b) the number of other properties and (c) the extent of the land holdings involved.
What was the total purchase price of property purchased for the purposes of the roads programme and now surplus to requirements; and what estimate he has made of the present value of this property.
What was the total purchase price of property purchased for the purposes of the roads programme and now surplus to requirements; and what estimate he has made of the present value of this property.
If he will list for each road scheme in the main and longer-term pre-1995 roads programme, the quantity and value of property (a) held, (b) acquired, (c) disposed of and (d) held but now surplus to requirements, incorporating the effects of the revisions to the programme in November 1995 and...
If he will list for each road scheme in the main and longer-term pre-1995 roads programme, the quantity and value of property (a) held, (b) acquired, (c) disposed of and (d) held but now surplus to requirements, incorporating the effects of the revisions to the programme in November 1995 and...
What income was obtained in each year since 1988 from the disposal of (a) houses, (b) other properties and (c) land which had been acquired for roads schemes but was no longer required.
What income was obtained in each year since 1988 from the disposal of (a) houses, (b) other properties and (c) land which had been acquired for roads schemes but was no longer required.
What expenditure was incurred in each year since 1988 in acquiring (a) houses, (b) other properties and (c) land for road schemes.
What expenditure was incurred in each year since 1988 in acquiring (a) houses, (b) other properties and (c) land for road schemes.
If he will list for each motorway and trunk road, in which parliamentary constituency each junction is located, based on (a) the present boundaries and (b) the new boundaries which come into effect from 1997. - The information in its entirety could be provided only at disproportionate cost. List of...
If he will list for each motorway and trunk road, in which parliamentary constituency each junction is located, based on (a) the present boundaries and (b) the new boundaries which come into effect from 1997. - The information in its entirety could be provided only at disproportionate cost. List of...
What is the average time taken in the tendering process for (a) Design, Build Fund and Operate roads projects and (b) other PFI transport projects. - Includes figure. (Holding answer 26 November 1996).
What is the average time taken in the tendering process for (a) Design, Build Fund and Operate roads projects and (b) other PFI transport projects. - Includes figure. (Holding answer 26 November 1996).
How much has been spent in public money in each year since 1993 on the tendering costs for Design, Build Fund and Operate roads projects, broken down by (a) consultants' and (b) other costs. - Includes text of letter from Lawrie Haynes of Highways Agency and figures.
How much has been spent in public money in each year since 1993 on the tendering costs for Design, Build Fund and Operate roads projects, broken down by (a) consultants' and (b) other costs. - Includes text of letter from Lawrie Haynes of Highways Agency and figures.
What plans he has to privatise the national roads network. - None.
What plans he has to privatise the national roads network. - None.
If he will list for each year since 1979, public sector investment in transport (a) overall, and (b) broken down for (i) roads, (ii) rail and (iii) other forms of transport, in real terms, cash terms and as a proportion of gross domestic product. - Includes fact that figures are...
If he will list for each year since 1979, public sector investment in transport (a) overall, and (b) broken down for (i) roads, (ii) rail and (iii) other forms of transport, in real terms, cash terms and as a proportion of gross domestic product. - Includes fact that figures are...
What assessment has been made of the impact of the Newbury by-pass on habitats of protected species; what are the comparative costs of construction in respect of (a) the Newbury bypass and (b) upgrading the existing route of the A34 in accordance with route option CA4; and what assessment has...
What assessment has been made of the impact of the Newbury by-pass on habitats of protected species; what are the comparative costs of construction in respect of (a) the Newbury bypass and (b) upgrading the existing route of the A34 in accordance with route option CA4; and what assessment has...