Pursuant to his Answer of 12th March, Official Report, column 240W, on the Baglan Bridge, if he will take steps to provide facilities to segregate smaller vehicles on the occasions it is safe for them to use the bridge.

Asked by
Lord Morris of Aberavon (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
20 March 1997
Reference
21151; 292 c713W;292 c714W
House
House of Commons

On how many occasions Baglan Bridge on the M4 has been closed for all traffic in the last 12 months; what was the longest period of closure, and for what reasons it is necessary to include vehicles other than high-sided vehicles in the ban on traffic. - Inc figs.

Asked by
Lord Morris of Aberavon (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
12 March 1997
Reference
19547; 292 c240W
House
House of Commons

How many kilometres of motorway are currently (a) open, (b) under construction, (c) planned in Wales, (i) as new motorway or (ii) as existing motorway being widened.

Asked by
Bill Olner (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
27 February 1997
Reference
17275; 291 c387W
House
House of Commons

What investigations have been carried out into possible alternatives to road-building in the case of the M4 Relief Road; and if he will publish the terms of reference of those investigations.

Asked by
Cynog Dafis (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
14 October 1996
Reference
40062; 282 c743W;282 c741W
House
House of Commons

What progress has been made in taking forward motorway and trunk road improvement schemes under the Private Finance Initiative.

Asked by
Walter Sweeney (Conservative)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
10 July 1996
Reference
36997; 281 c186-7W
House
House of Commons

What was the total cost of traffic management and associated engineering works necessary to maintain traffic flows throughout the contract period for the M4 Contract 3, Earlswood to Lon Las new motorway section. - Total traffic management costs for the M4 Earlswood to Lonlas contract were £2,199,000.

Asked by
Win Griffiths (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
24 June 1996
Reference
33391; 280 c50W
House
House of Commons

If he will publish the information he holds concerning traffic time delays during peak periods throughout the construction of the Earlswood to Lon Las section of the M4, with particular reference to information on the average of maximum time delays.

Asked by
Win Griffiths (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
24 June 1996
Reference
33390; 280 c50W
House
House of Commons

What study he has (a) commissioned and (b) evaluated concerning (i) the estimated loss of investment in the Swansea area because of traffic delays and congestion during the construction of the M4 from Earlswood to Lon Las and (ii) investment which could come to the Swansea area on the completion...

Asked by
Win Griffiths (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
24 June 1996
Reference
33389; 280 c49W
House
House of Commons

If he will list (a) the original estimate, (b) the cost in the tender accepted and (c) the total and final outturn costs of the main works M4 contract 3, Earlswood to Lon Las. - Inc figs.

Asked by
Win Griffiths (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
24 June 1996
Reference
33386; 280 c49W
House
House of Commons

What representations his Department has received concerning the need for an integrated transport study of the M4 corridor.

Asked by
Elfyn Llwyd (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
16 May 1996
Reference
27922; 277 c544W
House
House of Commons

What plans his Department has to undertake an integrated transport study of the M4 corridor.

Asked by
Elfyn Llwyd (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
16 May 1996
Reference
27899; 277 c544W
House
House of Commons

When his Department plans to publish a draft order concerning the M4 relief road. - It will be several years before the necessary work has been done to identify the scheme details and prepare draft orders.

Asked by
Elfyn Llwyd (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
16 May 1996
Reference
27898; 277 c544W
House
House of Commons

How many (a) deaths, (b) injuries and (c) accidents have occurred on the M4 in Wales since 1985. - Inc table.

Asked by
Elfyn Llwyd (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
14 May 1996
Reference
28706; 277 c423W;277 c422-3W
House
House of Commons

What representations he has received concerning the proposed M4 relief road.

Asked by
Elfyn Llwyd (Plaid Cymru)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
30 April 1996
Reference
27420; 276 c497W;276 c498W
House
House of Commons

When he will make final settlement to Haycan Ltd. in respect of the fencing contract for the M4 Brynglas Tunnels which was completed in May 1995. - This is a matter between Haycan Ltd and the main contractor for the scheme.

Asked by
Robert Key (Conservative)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
4 March 1996
Reference
18510; 273 c96W;273 c95W
House
House of Commons

What is the assessment of the effect of the proposed M4 relief road in Gwent on local sites of special scientific interest.

Asked by
Paul Flynn (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
19 July 1995
Reference
35875; 263 c1401W
House
House of Commons

What plans he has for an environmental impact assessment on the proposed M4 relief road from the Second Severn crossing and Castelton.

Asked by
Paul Flynn (Labour)
Answering body
Welsh Office
Type
Written questions
Status
Answered
Date
19 July 1995
Reference
35874; 263 c1401W
House
House of Commons
Answered by
Gwilym Jones (Conservative)
Answering body
Welsh Office
Type
Oral answers to questions
Date
16 January 1995
Reference
252 c442
House
House of Commons
Answered by
Gwilym Jones (Conservative)
Answering body
Welsh Office
Type
Oral answers to questions
Date
16 January 1995
Reference
252 c442
House
House of Commons
Answered by
Gwilym Jones (Conservative)
Answering body
Welsh Office
Type
Oral answers to questions
Date
16 January 1995
Reference
252 c442
House
House of Commons