Pursuant to his Answer of 12th March, Official Report, column 240W, on the Baglan Bridge, if he will take steps to provide facilities to segregate smaller vehicles on the occasions it is safe for them to use the bridge.
Pursuant to his Answer of 12th March, Official Report, column 240W, on the Baglan Bridge, if he will take steps to provide facilities to segregate smaller vehicles on the occasions it is safe for them to use the bridge.
On how many occasions Baglan Bridge on the M4 has been closed for all traffic in the last 12 months; what was the longest period of closure, and for what reasons it is necessary to include vehicles other than high-sided vehicles in the ban on traffic. - Inc figs.
On how many occasions Baglan Bridge on the M4 has been closed for all traffic in the last 12 months; what was the longest period of closure, and for what reasons it is necessary to include vehicles other than high-sided vehicles in the ban on traffic. - Inc figs.
How many kilometres of motorway are currently (a) open, (b) under construction, (c) planned in Wales, (i) as new motorway or (ii) as existing motorway being widened.
How many kilometres of motorway are currently (a) open, (b) under construction, (c) planned in Wales, (i) as new motorway or (ii) as existing motorway being widened.
What investigations have been carried out into possible alternatives to road-building in the case of the M4 Relief Road; and if he will publish the terms of reference of those investigations.
What investigations have been carried out into possible alternatives to road-building in the case of the M4 Relief Road; and if he will publish the terms of reference of those investigations.
What progress has been made in taking forward motorway and trunk road improvement schemes under the Private Finance Initiative.
What progress has been made in taking forward motorway and trunk road improvement schemes under the Private Finance Initiative.
What was the total cost of traffic management and associated engineering works necessary to maintain traffic flows throughout the contract period for the M4 Contract 3, Earlswood to Lon Las new motorway section. - Total traffic management costs for the M4 Earlswood to Lonlas contract were £2,199,000.
What was the total cost of traffic management and associated engineering works necessary to maintain traffic flows throughout the contract period for the M4 Contract 3, Earlswood to Lon Las new motorway section. - Total traffic management costs for the M4 Earlswood to Lonlas contract were £2,199,000.
If he will publish the information he holds concerning traffic time delays during peak periods throughout the construction of the Earlswood to Lon Las section of the M4, with particular reference to information on the average of maximum time delays.
If he will publish the information he holds concerning traffic time delays during peak periods throughout the construction of the Earlswood to Lon Las section of the M4, with particular reference to information on the average of maximum time delays.
What study he has (a) commissioned and (b) evaluated concerning (i) the estimated loss of investment in the Swansea area because of traffic delays and congestion during the construction of the M4 from Earlswood to Lon Las and (ii) investment which could come to the Swansea area on the completion...
What study he has (a) commissioned and (b) evaluated concerning (i) the estimated loss of investment in the Swansea area because of traffic delays and congestion during the construction of the M4 from Earlswood to Lon Las and (ii) investment which could come to the Swansea area on the completion...
If he will list (a) the original estimate, (b) the cost in the tender accepted and (c) the total and final outturn costs of the main works M4 contract 3, Earlswood to Lon Las. - Inc figs.
If he will list (a) the original estimate, (b) the cost in the tender accepted and (c) the total and final outturn costs of the main works M4 contract 3, Earlswood to Lon Las. - Inc figs.
What representations his Department has received concerning the need for an integrated transport study of the M4 corridor.
What representations his Department has received concerning the need for an integrated transport study of the M4 corridor.
What plans his Department has to undertake an integrated transport study of the M4 corridor.
What plans his Department has to undertake an integrated transport study of the M4 corridor.
When his Department plans to publish a draft order concerning the M4 relief road. - It will be several years before the necessary work has been done to identify the scheme details and prepare draft orders.
When his Department plans to publish a draft order concerning the M4 relief road. - It will be several years before the necessary work has been done to identify the scheme details and prepare draft orders.
How many (a) deaths, (b) injuries and (c) accidents have occurred on the M4 in Wales since 1985. - Inc table.
How many (a) deaths, (b) injuries and (c) accidents have occurred on the M4 in Wales since 1985. - Inc table.
What representations he has received concerning the proposed M4 relief road.
What representations he has received concerning the proposed M4 relief road.
When he will make final settlement to Haycan Ltd. in respect of the fencing contract for the M4 Brynglas Tunnels which was completed in May 1995. - This is a matter between Haycan Ltd and the main contractor for the scheme.
When he will make final settlement to Haycan Ltd. in respect of the fencing contract for the M4 Brynglas Tunnels which was completed in May 1995. - This is a matter between Haycan Ltd and the main contractor for the scheme.
What is the assessment of the effect of the proposed M4 relief road in Gwent on local sites of special scientific interest.
What is the assessment of the effect of the proposed M4 relief road in Gwent on local sites of special scientific interest.
What plans he has for an environmental impact assessment on the proposed M4 relief road from the Second Severn crossing and Castelton.
What plans he has for an environmental impact assessment on the proposed M4 relief road from the Second Severn crossing and Castelton.